Friday, 29 December 2017

Working on the Tree Stump






In the lounge I've made a paper mache bookcase and fixed beams under the ceiling and made a wooden floor from craft sticks which I stained with some wood stain.

I made books for the library at the front of the lounge. I also laid down some carpet.




To have more room in the kitchen I have built a pantry joining onto the kitchen. I'm trying to dress the rooms before I put on the next floor up because once the next floor goes on that will be impossible to do 

Saturday, 23 December 2017

The Tree Stump


I have just started work on a new house this time it's in the shape of a tree stump with lots of rooms in it which will eventually become a hotel down in the grove.
Some of the bark starting to go on the stump using thick strips of foil hot glued around the outside giving it a bark effect. 







Lots of rooms and corridors going in on three floors.
I'm using 3mm foam board which is easy to cut and then hot glue the walls into place after I've cut  any doors or windows out first. Lot's more to do.

Wednesday, 6 December 2017

Washing day



Esme's sorting out her washing


Shes got plenty to do today.



Shouldn't take too long to dry as it's very windy today.
All done time for a cup of tea.

Saturday, 2 December 2017

Bramble Grove gets a new post office





The bunting is up and the doors are about to open and it looks like Esme will be their first customer. 


The paper shop is at one side and the post office on the other.